Logo
Logo
  • Home
  • About Us
    • Our history
    • Our Team
    • Nationally-recognised training
  • Courses
    • Training Accreditation
    • Hyperbaric Worker’s Course
    • Lock Operator’s Course
    • Oxygen provision in hyperbaric accidents
    • First aid training
    • Workplace First Aid
    • Basic emergency life support
    • Hyperbaric tunnel worker’s medical
    • Trimix (normoxic)
    • Compressed Air Supervisor
  • Our projects
  • Products & Services
    • Oxygen Analysers
    • Breathing Air Analysis
    • Oxygen Intervention Kit
    • Gauge Calibration
    • Hyperbaric Tunnel Workers Handbook
    • Hyperbaric Workers Logbook
  • News
  • Contact

Hong Kong 1107 contract

    Project Details

    This project is part of the Hong Kong MTR Shartin to Central project consisting of 17kl of rail line and includes 10 stations.

    The 1107 contract is for the Diamonf Hill to Kai Tak North section and consists of twin tunnels, segmentally lined, 6.4m in diameter and with four cross passages.

    The project used a Herrenknecht EPT TBM working at a maximum pressure of 2.6 bar.

    The project was a Chun Wo – Seli Joint Venture.

     

    Close

    Footer Logo

    Copyright © 2016 - Pressureworx - powered by The Man In The Mill

    NTALogo